Saturday, 8 September 2018

Started Horizontal Stabiliser

Started the rear spar for the horizontal stabiliser. Deburred the components and final drilled the rear spar doubler to the rear spar.


Assembled the centre bearing bracket for the elevator attachment.

Primed and rivetted the rear spar doubler to the rear spar.

These rivets are countersunk to allow the centre bearing bracket to attached over the top.

I made a slight scuff while removing a poorly driven rivet, smoothed it up with a scotchbrite pad and sprayed some primer over it.

Horizontal stabiliser rear spar assembly complete, started the front spar assembly.

The plans call for countersunk rivets around the horizontal stabiliser attachment points. I made a mistake and over countersunk the upper rivet hole. I think I will be able to rivet it and continue building but will get confirmation from Vans.


Saturday, 17 February 2018

Finished Rudder


In the last couple of months I have finished the rudder. The trailing edge was riveted and then the leading edge shaped and riveted.






Once I was finished with the rudder, I put it in position next to the vertical stabiliser to get an idea of how it looks.